Construction of nine (9) buildings being built simultaneously with a state of the art 600 seat performing arts stage. To include a complex underground power and communication duct bank system to supply utilities to each bldg.

VIEW

Eldeco was able to expand and renovate the existing Central Energy Plant (CEP), construct a new 50,000sqft stand alone cancer center, and manage the installation of all low voltage data systems in multiple projects.

VIEW

Eldeco was able to add a 31,000 sq ft ICU floor on top of an existing hospital and install a new emergency power system within the CEP without disturbing hospital operations.

VIEW

Nuclear Operations Building
Jenkinsville, SC

Our $4.6 mil contract with VC Summer required the building of a 160,000 square foot Nuclear Operations Building, abiding by NRC regulations. Since 1977, only two nuclear power plant expansions have been approved in the US and...

VIEW

JCI Battery Recycling
Florence, SC

We held two contracts with JCI Battery Recycling, the first being an $11.5 mil building contract, and the second a $5 mil process contract. It was up to us to provide the complete electrical package for...

VIEW

Our challenge was to build a complex wood pellet "Biomass" Mill with 40% design drawings as a starting point while maintaining a 7 month construction schedule. We were able to provide the right project management and...