Redstone Gateway Building 1100
Client: Hoar Construction
Location: Huntsville, AL
Completion Date: 2014
Services Provided:
Installation of the Site power & lighting, primary power from Huntsville City Electric utility transformers to one Main Switchboards (1) 4000 amp and all lighting & power distribution panels, lighting control systems, Lightning Protection a full building ground system and all concrete encased secure data conduits entering the building.
Building Emergency Back-up provided by a 200kw Standby Diesel Generator. One UPS systems will provide back up for the critical systems. Electrical systems included complete fire alarm, & Tele/data systems.
The new 121,000 sq. 5 story LEED Certified office building for BOEING a major defense contractor. The 468-acre, master-planned project is located adjacent to Interstate 565 at Gate 9, the main gate into Redstone Arsenal. It consists of High level secure offices, Labs and Classified areas.