CLIENT: Stewart/Perry Construction

Leeds, AL

December 2019 - December 2020

What We Delivered

Full Electrical Installation
Integrated Power Centers
Natural Gas Generator
Prefabrication
Underground Conduit

Full electrical system for Buc-ee’s in Alabama

Eldeco provided the full electrical installation for  the 54,000 square foot Buc-ee’s travel center (including 116 gas pumps and six 40,000-gallon fuel tanks) in Leeds, Alabama.

The system includes

  • two 2500 amp switchboards
  • one 1000KW natural gas generator
  • one 2500 amp automatic transfer switch
  • one 50KW UPS
  • four integrated power centers
  • 15,000 feet of underground conduit
  • 430,000 feet of branch wire
  • 175,000 feet of feeder wire

Eldeco’s Prefabrication team contributed significantly to this project.  Many pieces were constructed in our central facility and transported to the site for installation.

Project Details

0

contract

0

square feet

0

gas pumps

0

feet of underground conduit

Contact the Eldeco team.

Come see what 50+ years of electrical design and construction expertise can do for your next project. Whether you’re looking for your next electrical contractor partner or just have a question for our team, we want to hear from you.

Get in Touch right arrow