Amazon PIL1

CLIENT: Bryan Builders

Horn Lake, MS

June 2020 - December 2020

What We Delivered

3D Modeling and Coordination
Data System
Design-Assist
Fire Alarm
Full Electrical Installation
Lighting
Prefabrication
Security System

Design-Assist from Eldeco Keeps Box Sorting Facility on Schedule

With a demanding 6-month schedule for this 855,000 facility, Eldeco’s engineering and design team stepped in to assist and keep full electrical installation moving forward on schedule.  The system included:

  • two 4000A main switches
  • two 4000A ATSs
  • two 4000A distribution switchboards
  • 53 distribution panels
  • four lighting inverters
  • 43 twenty-ton RTUs
  • 57 dock door levers
  • 750 cord drops
  • 900 light fixtures
  • fire alarm system
  • data system
  • security system

 

Project Details